Portland House, London
 |
 |
Congestion in the lift lobbies at Portland House was eliminated by the installation of Schindler Miconic 10 destination control. More |
Royal Liver Building, Liverpool
 |
 |
Schindler ID allows the 20th century Royal Liver Building to meet the needs of the 21st Century. More |
Barnsley Hospital
 |
 |
The Schindler 2500 bed lift and Schindler ID elevator control were installed at Barnsley Hospital. |
|
 |
133 Houndsditch, London
 |
 |
The lift system at this busy office building in the City of London required updating. More |
Peterborough Court, London
 |
 |
Schindler's destination control system was installed at this busy office thereby increasing the efficiency of the lift system. More |
Shell Building, London
 |
 |
The famous Shell Building on the banks of the River Thames is undergoing a lift modernisation project. More |
|